The Philippines customer has a gold ore processing plant, the plant originally used ordinary thickener for tailings treatment, but the low concentration of the bottom stream, small capacity, resulting in a large tailings storage area and low utilization rate of return water.
After the thickener was put into use, the concentration of the bottom stream was increased from about 31% to more than 55%, and the processing capacity was also greatly increased. It not only reduces the footprint of the tailings pond, but also improves the utilization rate of the return water, reduces production costs and wastewater discharge, and thus achieves environmental protection and energy saving.
GX-15 thickener has a long middle feeding barrel and a large diameter feeding disk at the bottom, which can make the slurry feed into the thickener more uniformly and smoothly, avoiding the problems of poor local precipitation effect caused by uneven feeding, and improving the thickening efficiency.
GX-15 thickener eliminates air bubbles through the air elimination storage tank, so that the solid particles in the slurry can be better settled, thus improving the concentration of the underflow, which is conducive to the subsequent tailings treatment or resource recycling.
Whether it is fine-grained slurry or slurry containing certain viscous substances, GX-15 thickener can effectively thicken, reducing the unstable operation of the equipment due to changes in material characteristics.
GX-15 thickener has solid structure and corrosion-resistant material, which can adapt to the harsh working environment. And through the optimization of equipment design and operation process, it can reduce the energy consumption and operation cost of the thickener, so as to save the cost for the customers.
Crusher is an essential equipment in the construction site, it can crush the large stone into small pieces, easy to use, save time, and help the whole project progress, and even play the role of whether the project can be completed on schedule.
In industries such as mining, construction and aggregate recycling, the motor speed is 980 rpm, and after the small pulley passes to the big pulley, it will reduce the speed to 250 rpm.
Rock crushing equipment works by feeding rock into a feed opening where it is crushed through a series of operations by crushing and screening machines until it is the desired size. The material is then conveyed onto a conveyor belt, which transports the material to the facility or location specified by the customer.
With the current demand for crushed stone for construction projects, there is a lot of room for profitable upside in the stone crushing industry. However, success in this industry requires careful planning, market research, operational efficiency, cost management and compliance with environmental regulations. What’s more, it requires a competent and experienced company with a suitable solution.
A variety of models are available | Get the free price list! Wet pan mill, also known as gold ore grinding mill,round mill,Wet discs mill, consists of rollers and discs as the main working parts. It is named after ...
View detailsThe current sand and gravel market faces high demand but limited natural sand resources and rising prices. Conventional sand-making production lines suffer from low output and inconsistent quality. When searching for “clinker sand-making plants,”...
View detailsThe “ball mill + classification production line” represents the mainstream solution for dry ultra-fine powder processing today. It integrates grinding and particle size control within a closed-loop system, enabling efficient and economical produc...
View detailsRecently, an African client contacted us seeking to concentrate gold and sulfur from sulfur ore. Based on the client's requirements and existing equipment, and to prevent tailings loss, our engineer recommended the Model 900 spiral chute. After...
View details